Ranked #4 best sellers in Laboratory Heating EquipmentsSample-based customizationFinished product inspectionOn-site material inspectionSupplier assessment procedures
Complete Production Line: We have 5 workshops including metal plate, painting, MoSi2 heating element, chamber carve, furnace assembling & QC.
Fast Delivery: Around 600 standard models are in stock and have the ability to finish the production of furnace shell, chamber, and heating element in a quick time.
Stable Quality: We have a professional quality control department, IQC for raw material testing; QC for the testing of products before packing.
Professional Technical Team:We have a production technical team for mechanical design, electrical automation control, and thermal technology, we are able to provide the best solution according to customer requirements.
With our talented and experienced engineers, we will help you create a furnace that you will absolutely love.
Supplier
This supplier has been verified onsite by world-leading inspection company,
SGS Group
Verified onsite by world-leading inspection company, SGS Group
2024.01.29
by {0}
Sample-based customization
The data is from past contract of the latest inspection report as assessed by independent third parties.
Finished product inspection
The data is from onsite check of the latest inspection report assessed by independent third parties
On-site material inspection
The data is from onsite check of the latest inspection report assessed by independent third parties
Supplier assessment procedures
The data is from onsite check of the latest inspection report assessed by independent third parties
Sample-based customization
The data is from past contract of the latest inspection report as assessed by independent third parties.
Finished product inspection
The data is from onsite check of the latest inspection report assessed by independent third parties
On-site material inspection
The data is from onsite check of the latest inspection report assessed by independent third parties
Supplier assessment procedures
The data is from onsite check of the latest inspection report assessed by independent third parties